Applications

Motorized Screens for Restaurants & Hospitality

Terrace seating only earns when guests will sit in it. Screens are how a patio stays sellable through an August afternoon, a mosquito-heavy evening and a passing front.

The problem

Count the Days the Terrace Cannot Be Sold

Every hospitality patio has a number attached to it: how many service periods a year the seating is actually usable. In this climate that number is often lower than it looks.

Afternoon sun can take out the covers between roughly two and six through the summer. Mosquito season runs May through October by Montgomery County Mosquito Control's own description, and it takes out exactly the dinner service the terrace was built for. A single front clears the whole area in minutes, and the tables can stay empty for the rest of the night because nobody wants to sit on wet chairs.

The specification question is not really comfort. It is how many of those service periods you can buy back.

Design considerations

What Commercial Work Adds

Staff operation

Whoever opens on a Tuesday is not the person who was there at handover. Grouped controls and one obvious wall station beat a drawer of handheld remotes.

Duty cycle

Commercial screens often run on a service schedule — down and up again around each service, day after day. Motor selection and expected service life are specified against that rather than against residential usage.

Service flow

Where the screens land has to work with how food gets to the terrace, where the pass is, and how guests enter. A screen that blocks a service route will get propped open and stop earning.

Appearance from outside

With the screens down, they are the building's street frontage for a large share of the year. Frame finish and fabric color are brand decisions.

Landlord and jurisdiction

Commercial exterior alterations are more likely to involve a landlord, a center's architectural criteria and a permitting process than a residential retrofit. Raise all three at the first conversation.

Installing around trading

Closing a terrace for installation costs revenue. Sequencing is part of the quote, and it deserves a realistic answer rather than an optimistic one.

A note on this page

We Are Not Borrowing Someone Else's Restaurant

The manufacturer photography supplied to us includes a restaurant with readable third-party signage. We have deliberately kept it off this page, because a picture of a named restaurant sitting under a hospitality heading reads as a client reference whether or not the caption says so.

Sable has no commercial installations photographed yet. When it does, they will appear here with the operator named and their permission on file.

Questions

Questions From Operators

How many extra service periods will this buy us?

We will not invent a figure. It depends on your orientation, your covered area, how the terrace trades and which materials go where. What we will do is walk the space at the times it currently fails and be specific about which of those we can address.

Can staff run several screens at once?

Yes, and they should. Grouping an elevation onto one control, with scenes for opening and close-down, is standard on commercial work and is specified up front.

Do we need a permit or landlord approval?

Frequently both. Exterior alteration to a commercial building is more likely to be permitted work than a residential patio, and a lease may require landlord consent. Tell us the jurisdiction and the landlord early.

Will we have to close the terrace to install?

Partly, for part of the time. How much and for how long depends on the structure and the number of openings, and it is established at the site visit rather than guessed at.

What happens in high wind?

Everyday commercial screens are retracted ahead of high wind, which is a training and control question as much as a hardware one. Storm protection is a separate product and specification class with its own structural and product requirements — see storm protection screens.

Start a project

Tell Us When the Terrace Stops Selling

Which hours, which months, and which side of the building. That is the brief.